| SYLLABUS FOR E3D | |||
| Date | Time | E3D – Training of Plant Design, Modelling and Drafting | |
| Courses Duration 45 Days | 90 Hrs. | Advanced Training | Exercise |
| Day 1 to 6 | 2.00PM – 3.00PM | Equipment Modelling | Practice & Exercise – 1 |
| Introduction of E3D Equipment Modeling & Piping (Creation of Equipment Primitives & STD) | |||
| Create Nozzle, Placement, Type of nozzle, Orientation, Specification Selection,offset, mirror & Rotate | |||
| Co-ordination, Position, Create list, Explicity & Relatively Position and Position controal tool | |||
| 3.00PM – 4.00PM | Modifying standard equipment, specification, properties, attributes, nozzle spec. and equ. Origin. | Practice & Exercise – 2 | |
| Model Editor, Edit settings selection settings | |||
| Creation working plane, Different shape use with Extrusion Primitives, Revolution primitives & Mitter Bends | |||
| General settings, Display settings, members, view settings and command window, querry setting | |||
| Day 7 to 12 | 2.00PM – 4.00PM | Piping Modeling | Practice & Exercise – 3 |
| Piping fundamental, Create pipe, branch, piping components, pipe work hierarchy | |||
| pipe orientation, connecting pipe, placing pipe, branch replacing, create insulation of pipe | |||
| Create tracing of piping, material selection of pipe, connect method | |||
| Explicit method, Modify spec. component, bore, Arrive & Leave, slope & material selection. | |||
| Orientation, Assemblies, Splitting, Pipe ISOmetric, system ISOmetric drawing, Data consistency, pipe penetration. | |||
| Position of branch, Maintain bottom of pipe and Drag piping & Clash checking and pipe work toolbar | |||
| Day 13 to 18 | 2.00PM – 4.00PM | Structure Modeling | Practice & Exercise – 4 |
| Introduction of Structural Modeling & creation of 3D models and Hierarchy | |||
| set default profile for section, set section storage area, node storage area, working plant grid, | |||
| create section using stright method, curved method, ring method and regular structure | |||
| Create tower, upper & lower SOP bracing configuration, joint creation, base plate creation, foundation creation | |||
| Modifying section, creat fittings positioning, creation bracing gap, Miter ends | |||
| Creation of wall & floor | |||
| Creation of panel, Extrus\panel negative extrusion, level vertical, splitting, positioning | |||
| Creation & modification of stair flight, stair tower, ladder and circular platform | |||
| Creation of rectangular, circular, freeform, polygon platform, opening, platform geometry & layout, Handrail | |||
| section connection, orientation, general settings, grid creation, query & utility setting, user grid system, constructs grid. | |||
| Day 19 to 23 | 2.00PM – 4.00PM | Electrical Modeling | Practice & Exercise – 5 |
| Cable tray Modeling & cabling system | |||
| Creation modification of cableway, branch elements,route point, route node, check connection | |||
| Cable tray support | |||
| Day 24 to 29 | 2.00PM – 4.00PM | HVAC Modeling | Practice & Exercise – 6 |
| Creating inline plant equipment like AHU, DUCT Routing, Apply gide and tiles on grid | |||
| Creation HVAC Components, Positioning, Spec.generator. | |||
| Day 30 & 35 | 2.00PM – 4.00PM | Hangers & Supports | Practice & Exercise – 7 |
| Creating hangers & supports, Pipe rack, configuration, positioning of support, support plan, | |||
| support relocation, Max span, Steel profile, Support Axes and general utilities. | |||
| Day 36 & 41 | 2.00PM – 4.00PM | Report (MTO) | Practice & Exercise – 8 |
| Report generation(MTO) using template, Creation of template modification | |||
| Pipe and steel MTO, Nozzle & Valve schedule preparation, | |||
| Column Report, Summery and report format | |||
| Day 42 to 45 | 2.00PM – 4.00PM | Spooler & ISO Draft | Practice & Exercise – 9 |
| Fabrication drawing, ISOmetric drawing, Creation of spool drawing, field & shop weld creation | |||
| Spool break and isometric drawing, | |||
| Modify MTO status, Convert DXF, DWG & DGN | |||
| Day 42 to 45 | 2.00PM – 4.00PM | Drawing manager | Practice & Exercise – 9 |
| Generate 2D view from 3D View, create department, sheet, user defined view, limits, Modification | |||
| Create 2D Draft, shapes, symbols, text and modify dynamic primitives, sketch Drafting | |||
| Load text, add local symbol, | |||
| Auto tagging, auto drawing production visibility and placement, Equipment Center line and pipe end label. | |||
| Hangers & Supports detailing, converting to dwg format and auto drawing production | |||
| Creation view generation, create section flat, section perpendicular, stepped, Detail view | |||
| Day 42 to 45 | 2.00PM – 4.00PM | Commands | Practice & Exercise – 9 |
| Over all clash checking, auto clash, auto Naming, Hole management | |||
| Associations, Date base export & import, export for other software formate | |||
| 3D view options, Draw list, Hide file, new local view section | |||
| Representation, setting and auto color | |||