SYLLABUS FOR E3D |
Date |
Time |
E3D – Training of Plant Design, Modelling and Drafting |
|
Courses Duration 45 Days |
90 Hrs. |
Advanced Training |
Exercise |
Day 1 to 6 |
2.00PM – 3.00PM |
Equipment Modelling |
Practice & Exercise – 1 |
Introduction of E3D Equipment Modeling & Piping (Creation of Equipment Primitives & STD) |
Create Nozzle, Placement, Type of nozzle, Orientation, Specification Selection,offset, mirror & Rotate |
Co-ordination, Position, Create list, Explicity & Relatively Position and Position controal tool |
3.00PM – 4.00PM |
Modifying standard equipment, specification, properties, attributes, nozzle spec. and equ. Origin. |
Practice & Exercise – 2 |
Model Editor, Edit settings selection settings |
Creation working plane, Different shape use with Extrusion Primitives, Revolution primitives & Mitter Bends |
General settings, Display settings, members, view settings and command window, querry setting |
Day 7 to 12 |
2.00PM – 4.00PM |
Piping Modeling |
Practice & Exercise – 3 |
Piping fundamental, Create pipe, branch, piping components, pipe work hierarchy |
pipe orientation, connecting pipe, placing pipe, branch replacing, create insulation of pipe |
Create tracing of piping, material selection of pipe, connect method |
Explicit method, Modify spec. component, bore, Arrive & Leave, slope & material selection. |
Orientation, Assemblies, Splitting, Pipe ISOmetric, system ISOmetric drawing, Data consistency, pipe penetration. |
Position of branch, Maintain bottom of pipe and Drag piping & Clash checking and pipe work toolbar |
Day 13 to 18 |
2.00PM – 4.00PM |
Structure Modeling |
Practice & Exercise – 4 |
Introduction of Structural Modeling & creation of 3D models and Hierarchy |
set default profile for section, set section storage area, node storage area, working plant grid, |
create section using stright method, curved method, ring method and regular structure |
Create tower, upper & lower SOP bracing configuration, joint creation, base plate creation, foundation creation |
Modifying section, creat fittings positioning, creation bracing gap, Miter ends |
Creation of wall & floor |
Creation of panel, Extrus\panel negative extrusion, level vertical, splitting, positioning |
Creation & modification of stair flight, stair tower, ladder and circular platform |
Creation of rectangular, circular, freeform, polygon platform, opening, platform geometry & layout, Handrail |
section connection, orientation, general settings, grid creation, query & utility setting, user grid system, constructs grid. |
Day 19 to 23 |
2.00PM – 4.00PM |
Electrical Modeling |
Practice & Exercise – 5 |
Cable tray Modeling & cabling system |
Creation modification of cableway, branch elements,route point, route node, check connection |
Cable tray support |
Day 24 to 29 |
2.00PM – 4.00PM |
HVAC Modeling |
Practice & Exercise – 6 |
Creating inline plant equipment like AHU, DUCT Routing, Apply gide and tiles on grid |
Creation HVAC Components, Positioning, Spec.generator. |
Day 30 & 35 |
2.00PM – 4.00PM |
Hangers & Supports |
Practice & Exercise – 7 |
Creating hangers & supports, Pipe rack, configuration, positioning of support, support plan, |
support relocation, Max span, Steel profile, Support Axes and general utilities. |
Day 36 & 41 |
2.00PM – 4.00PM |
Report (MTO) |
Practice & Exercise – 8 |
Report generation(MTO) using template, Creation of template modification |
Pipe and steel MTO, Nozzle & Valve schedule preparation, |
Column Report, Summery and report format |
Day 42 to 45 |
2.00PM – 4.00PM |
Spooler & ISO Draft |
Practice & Exercise – 9 |
Fabrication drawing, ISOmetric drawing, Creation of spool drawing, field & shop weld creation |
Spool break and isometric drawing, |
Modify MTO status, Convert DXF, DWG & DGN |
Day 42 to 45 |
2.00PM – 4.00PM |
Drawing manager |
Practice & Exercise – 9 |
Generate 2D view from 3D View, create department, sheet, user defined view, limits, Modification |
Create 2D Draft, shapes, symbols, text and modify dynamic primitives, sketch Drafting |
Load text, add local symbol, |
Auto tagging, auto drawing production visibility and placement, Equipment Center line and pipe end label. |
Hangers & Supports detailing, converting to dwg format and auto drawing production |
Creation view generation, create section flat, section perpendicular, stepped, Detail view |
Day 42 to 45 |
2.00PM – 4.00PM |
Commands |
Practice & Exercise – 9 |
Over all clash checking, auto clash, auto Naming, Hole management |
Associations, Date base export & import, export for other software formate |
3D view options, Draw list, Hide file, new local view section |
Representation, setting and auto color |